ARGE Uetlibergtunnel, installation of intermediate slab

|
|
| |
|
| |
|
 |
Dimensions: 2 tunnels of 4'160 m each, 10.5 m width x 4.5 m height |
 |
Structural clearance: 10.5 m W x 4.5 m H |


|
Standard solution: loose bar reinforcement, 8 positions, 855 single bars |
 |
Total construction period: 2005 - 2007 |
 |
Installation costs: 1'120 Mio CHF |
 
|
With BAMTEC: Reinforcement per day stage is finished in 2 hours!
3500 kg BAMTEC laid / 850 kg welded reinforcement laid / Weight savings of appr. 5% / 1'990 tons of BAMTEC |
Project and site management:
Amberg Engineering, Regensdorf, CH
BAMTEC partner and supplier:
SFS Locher, Heerbrugg, CH |