RWE Tower, Dortmund, Germany

|
|
| |
|

 |
Highest building in Dortmund! 91 height, lenticular floor plan with 55 m length and
26 m width |
 |
20 floors superposed |
 |
2 t of BAMTEC per floor |

 |
The crucial factor during this building's construction was the reduction of the construction time due to BAMTEC. In 1½ days each of the floors was reinforced with BAMTEC. |
Constructor:
Oevermann GmbH + Co. KG, Münster
Architect/engineer:
Gerber Architekten, Dortmund
BAMTEC partner and supplier:
Beiderwieden + Kranefeld, Lübbecke, DE |
| |
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
MiCasa8 Student Accommodation VIC, Melbourne, Australia

|
|
| |
|
| |
|
 |
219 student's apartments |

 |
Termination of the building: 2 months before target-date |
Constructor:
Galvin Construction
Architect:
Hayball Leonard Stent
BAMTEC partnerr:
OneSteel, Artarmon NSW, AU |
| |
|
|
|
|
|
|
|
|
|
|
 |
|
 |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
Aussichtsturm Erlebnispark Teichland - Rohbau Basement & Turm

|
|
| |
|
  |
|
 |
Tower height: 47,25 m |
 |
Reinforcing steel: 63,2 t |
 |
Construction period: 06/2009 - 09/2009 |
The top layer base and the ground floor slab were reinforced with BAMTEC.
Idea + concept:
Daniel Slota
Execution:
Echterhoff Bau GmbH, Dessau
Architect:
AWB Architekten, Dresden (+ Daniel Slota)
General engineer:
grbv Ingenieure, Hannover
Site supervision:
Dipl.-Ing.-(TU) Dirk Böhme, Cottbus
Inspection engineer:
PAHN & Partner Prüfbüro für Baustatik GbR, Cottbus |
| |
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
 |
| Edifícios comerciais / de escritórios |
 |
| |
 |
| Edifìcios públicos |
 |
| |
 |
| Centros comerciais |
 |
| |
 |
| Estruturas industriais |
 |
| |
 |
| Aeroportos |
 |
| |
 |
| Centros de logística |
 |
| |
 |
| Aerogeradores |
 |
| |
 |
| Túneis / estradas |
 |
| |
 |
| Paredes / barreiras |
 |
| |
| |
| atrás |
|