Orkdalsvegen E OPS E39 Environmental Tunnel
BAMTEC in a tunnel with open construction

|
|
| |
|
| |
|

 |
Top and prefabricated wall reinforcement with BAMTEC |

 |
Installation BAMTEC: An up to 3 tons heavy BAMTEC wall reinforcement is transported by means of cross-beam and crane to the
next tunnel section |
Constructor:
Skanska Norge AS
BAMTEC partner and supplier:
Celsa Steel Service, Oslo, NO |
Osbudamm, construction of a concrete dam

|
|
| |
|
| |
|

 |
Particularities: The walls of concrete dam Osbudamm were reinforced under extreme winter conditions with BAMTEC. |

 |
The BAMTEC elements are welded together and connected, after that the special cross
beam lifts up the 3 tons weighty elements and install them onto the slant. |
BAMTEC partner and supplier:
Celsa Steel Service AS, Oslo, NO |